AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
DESPEC
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 11:37:46 2025
Author
*
:
Subject
*
:
08:00 Still have beam for the time being. Currently on file R4_2049 FEE Stats - attachment 1 FEE Temps ok - attachment 2 Bias and leakage currents - attachment 3 System wide checks all ok *except aida09 fails clock check with value 6 which is ok* Plan for the morning is once beam is lost is Ge group will enter and place source on the snout to perform efficiency measurement. Once they have left the area and are taking data a pulser walkthrough will be performed. Patrick can then have access to the system 08:16 Beam taken away Data taken stopped on file R4_2055 Will perform a pulser walkthrough now Pulser walkthrough started on R5 1V->0.1V in 0.1V steps Pulser setting - attachment 4 p+n pulser peaks - attachment 5 n+n pulser "peaks" - attachment 6
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown