08:00 Still have beam for the time being. Currently on file R4_2049 FEE Stats - attachment 1 FEE Temps ok - attachment 2 Bias and leakage currents - attachment 3 System wide checks all ok *except aida09 fails clock check with value 6 which is ok* Plan for the morning is once beam is lost is Ge group will enter and place source on the snout to perform efficiency measurement. Once they have left the area and are taking data a pulser walkthrough will be performed. Patrick can then have access to the system 08:16 Beam taken away Data taken stopped on file R4_2055 Will perform a pulser walkthrough now Pulser walkthrough started on R5 1V->0.1V in 0.1V steps Pulser setting - attachment 4 p+n pulser peaks - attachment 5 n+n pulser "peaks" - attachment 6
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
Screenshot_from_2022-05-17_08-00-50.png
Original size: 1910x507
Attachment 2:
Screenshot_from_2022-05-17_08-01-13.png
Original size: 1913x557
Attachment 3:
Screenshot_from_2022-05-17_08-01-25.png
Original size: 734x462
Attachment 4:
Screenshot_from_2022-05-17_08-49-02.png
Original size: 476x675
Attachment 5:
Screenshot_from_2022-05-17_08-51-19.png
Original size: 1913x901
Attachment 6:
Screenshot_from_2022-05-17_08-51-52.png
Original size: 1913x887
Attachment 7:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown