> 08:00 Still have beam for the time being. > Currently on file R4_2049 > > FEE Stats - attachment 1 > FEE Temps ok - attachment 2 > Bias and leakage currents - attachment 3 > System wide checks all ok *except aida09 fails clock check with value 6 which is ok* > > Plan for the morning is once beam is lost is Ge group will enter and place source on the snout to perform efficiency measurement. > Once they have left the area and are taking data a pulser walkthrough will be performed. > Patrick can then have access to the system > > 08:16 Beam taken away > Data taken stopped on file R4_2055 > Will perform a pulser walkthrough now > > Pulser walkthrough started on R5 > 1V->0.1V in 0.1V steps > Pulser setting - attachment 4 > p+n pulser peaks - attachment 5 > n+n pulser "peaks" - attachment 6
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown