AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
DESPEC
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 11:38:55 2025
Author
*
:
Subject
*
:
X projection of high energy channel ADC hits from R13 (attachment 1) XY hit pattern from R13 (attachment 2) -discontinuity observed -possible timing issues or issues with Event Clustering X projection of high energy channel ADC hits from R16 (attachment 3) XY hit pattern from R16 (attachment 4) -Beam was being diffused at this point, and tpcs were being calibrated. -Gap between Y strips ~ 23 -> 30 High Energy Ey vs Ex plots from R13 and R16 (attachments 5 and 6 respectively)
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown