AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
DESPEC
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Mon Jun 27 17:03:09 2022
Author
*
:
Subject
*
:
<p>16:00 Took over the shift from OH no beam yet.</p> <p>18:00 Still no beam yet.</p> <p>Statistics, Temperature, Current are checked and attached 1-3</p> <p>system wide checks same as last updated in the previoues shift.</p> <p>22:00 The beam is back but not taking data yet! FRS team doing some checkings</p> <p>Statistics, Temperature, Current are checked and attached 4-6</p> <p>system wide checks same as last updated in the previoues shift.</p> <p>23:30 beam is back and taking data</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
Statistics2022-06-27_18-02-25.png
Original size: 1912x437
Attachment 2:
Temperature2022-06-27_18-01-14.png
Original size: 1905x430
Attachment 3:
Current2022-06-27_17-59-55.png
Original size: 725x495
Attachment 4:
Statics2022-06-27_22-12-07.png
Original size: 1851x417
Attachment 5:
Temperature2022-06-27_22-11-21.png
Original size: 1859x421
Attachment 6:
Current2022-06-27_22-10-12.png
Original size: 725x497
Attachment 7:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown