Message ID: 540     Entry time: Mon Mar 18 18:04:43 2024
Author: NH 
Subject: Preparation for pre-s100 dry run (and test beam???) 
In preparation for the dry run the following *temporary* changes to the FEE numbering have been prepared
These should be reverted after the dry run to ensure cable->fee agreement again

AIDA09 => AIDA06
AIDA11 => AIDA07
AIDA12 => AIDA08

This will allow the merger to run with 8 FEEs for 1 DSSD

dhcpd.conf updated

The 2023Oct19-13.46.30 should work with this numbering (check tomorrow)

As should layout GSI_triple_test_renumber 

AFTER dry run:

Revert DHCP and prepare for full 16 FEEs 

Make new ASIC settings key for 16 FEEs and prepare the aidaXX folders

Prepare a new Layout.mlf set