AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC  ELOG logo
Message ID: 583     Entry time: Sat Apr 20 17:52:27 2024
Author: TD, NH 
Subject: Saturday 20 April contd. 
Note 40kBq 60Co source placed on bottom surface of snout centred on bPlas detectors and DSSSDs

18.50 Primary beam 750MeV/u Er to S4
      Primary beam stopped by flange (5cm s/steel in position upstream of implantation stack)

      Observe c. 2MeV dE peak in AIDA DSSSD#1 and DSSSD#2 using MIDASsort online analysis - attachment 1



21.50 Primary beam 1000MeV/u Er to S4 - attachment 2

      per DSSSD e_front versus e_back, 20keV/channel
      DSSSD #1 x & y -axis projections

10.50 Overnight stats - attachment 3
      Primary beam ?
      per DSSSD e_front versus e_back, 20keV/channel
      DSSSD #1 x & y -axis projections
      note multiple dE peaks observed in both DSSSDs
Attachment 1: Screenshot_from_2024-04-20_18-51-53.png  64 kB  Uploaded Sat Apr 20 18:54:12 2024  | Hide | Hide all
Screenshot_from_2024-04-20_18-51-53.png
Attachment 2: Screenshot_from_2024-04-20_21-52-08.png  1.051 MB  Uploaded Sat Apr 20 21:52:35 2024  | Hide | Hide all
Screenshot_from_2024-04-20_21-52-08.png
Attachment 3: Screenshot_from_2024-04-21_10-52-19.png  1.306 MB  Uploaded Sun Apr 21 10:53:02 2024  | Hide | Hide all
Screenshot_from_2024-04-21_10-52-19.png
ELOG V3.1.4-unknown