AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
DESPEC
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 11:38:00 2025
Author
*
:
Subject
*
:
<p>First checks of shift. All looks ok.</p> <p>Screenshot of HV, temps, rates, Merger attached. Attachments 1-4.</p> <p>Screenshots of all spectrum Layout IDs taken before zeroing at 16.35. (Attachments 5-12)</p> <p> </p> <p>checks at 16.00 - merger has crashed - aida01 dropped out - Tom tried to stop DAQ but got an error. Restart servers restarted at 16.09 </p> <p>Reset 01, restarted DAQ, and restarted as R16.</p> <p>16.15 Data seems to be collected but spectra not being incremented in aida01. Timestamps look to be out of sync. Tom restarting aida01 again.</p> <p>Did not fix, power cycle all FEEs - all spectra reset. aida3,6,11,12,14,15 wont calibrate adcs so wont have waveforms</p> <p>RUN17 STARTED 16.51|</p> <p> HV, temps, rates, Merger looks ok 17.00. Plots saved as attachments 13-16.</p> <p> </p> <p>20.47, all looks ok - see attachment 17-20. Rates are higher in attachment 20 than in attachment 2 from start of shift</p> <p>21.59 aida02 (link aida1) stopped taking data and dropped out of the merger (see attachment 21). Came back to life after about 15 miutes. Tom logged in remotely to investigate. Seems to be ok. see attachment 22 for timestamps</p> <p>22.48 - things apear ok. (Attachments 23-26) </p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown