AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
DESPEC
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 11:38:56 2025
Author
*
:
Subject
*
:
<p>The other 6 FEEs were powered on one at a time to check no issues. None found.<br /> All 12 FEEs plugged back into the PSU.</p> <p>Note: The FEE temperatures reported on Friday were before a Reset/Setup of the DAQ, which means the ASICs run very fast and the hence run hotter.<br /> Reset/Setup shows more sustainable temps (attached)</p> <p>These temps are similar to those observed in Sep 2018 but warmer by ~4 C than those observed Dec-Jan and April.</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown