AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
DESPEC
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 11:38:16 2025
Author
*
:
Subject
*
:
AIDA and the Snout have been remounted in S4 I had a check of the AIDA connectors and all looked good, the kapton PCB connectors were sitting comfortably above the interstage and I saw no stressed/loose connectors. Multimeter showed no continuity between snout or inter-stage and AIDA ground We put a single layer of wide black tape inside the end-cap to improve the light seal and minimise reflections After mounting the snout I managed to bias both DSSDs to 100 V with no issues. I had to raise the DSSD#1 (Ch0) limit to 40 uA because it rises quite high during ramp up (then settles). It is very hot in S4 (28 C) and the roof is closed for high-radiation experiments, so I expect it to get hotter. DSSD leakage currents were similar to before (20 and 15 uA) There is also the new Temp and Humidity monitor, which you can view on AnyDesk at 192.168.11.119 (I think), there is a firefox window open already
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown