AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
DESPEC
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 11:24:19 2025
Author
*
:
Subject
*
:
> AIDA and the Snout have been remounted in S4 > > I had a check of the AIDA connectors and all looked good, the kapton PCB connectors were sitting comfortably above the interstage and I saw no stressed/loose connectors. > Multimeter showed no continuity between snout or inter-stage and AIDA ground > > We put a single layer of wide black tape inside the end-cap to improve the light seal and minimise reflections > > After mounting the snout I managed to bias both DSSDs to 100 V with no issues. I had to raise the DSSD#1 (Ch0) limit to 40 uA because it rises quite high during ramp up (then settles). > > It is very hot in S4 (28 C) and the roof is closed for high-radiation experiments, so I expect it to get hotter. DSSD leakage currents were similar to before (20 and 15 uA) > > There is also the new Temp and Humidity monitor, which you can view on AnyDesk at 192.168.11.119 (I think), there is a firefox window open already
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown