AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
DESPEC
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 11:41:50 2025
Author
*
:
Subject
*
:
<p>15:40 reseated FEE64s adaptors of aida01, aida09, aida13 & aida16.</p> <p>TEMP OK. HV OK. System wide checks all passed excl. aida07 ADC calibration, see attached.</p> <p>Histograms and rates look same as previous, reseating aida01 seems to have worked. aida16 still unhappy.</p> <p>re-reseated aida16. 16:19 - appears to have fixed the problem in the channel.</p> <p>Pulser test + connected.</p> <p>bPlast ground removed from frame.</p> <p>To-do:</p> <p>- Need clarification about links connected on AIDA n+n FEE64 adaptor boards. Currently, the situation is given by the attachment 8 & 9.</p> <p>- Fix BB7 grounding, continuity between snout and frame observed.</p> <p>- Pulser walkthrough for n+n, can do p+n when convienient.</p> <p> </p> <p> </p> <p>18.30 Noted FEE64 ADC stats now significantly higher ( attachments 9-10 ) cf. earlier this afternoon (attachments 1-2)</p> <p>DSSSD bias OFF. FEE64 power OFF.</p> <p> </p> <p> </p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown