AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
DESPEC
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Wed Jul 23 15:04:26 2025
Author
*
:
Subject
*
:
<p>Attachment1: AIDA05.1.8L when AIDA05 connected, biased at 100 V with not-shielded cables, after the DEGAS platform has been closed, the 2 tiles of BB7 have been connected to the mesytec preamps. BB7 is not biased. The mesytec preamps have been fully connected and supplied but 6/8 black cables are not connected on the other side. 4X and 4Y are connected to the 2 FEBEX cards.</p> <p>The 2 drain wires of bplast that were hanging on the bottom are now taped to the snout, not making any antena effect anymore.</p> <p>FWHM: 79 channels (to be compared with the previous elogs between 73 channels and 76 channels)</p> <p><strong>Conclusion</strong>: no significant differences can be observed when BB7 is connected. The tail on the left side of the spectrum in twice as small, most likely because on the now-taped drain wires of bplast</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
Screenshot_from_2025-07-23_16-16-57.png
Original size: 1917x829
Attachment 2:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.3-7933898