AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
DESPEC
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Nov 22 15:56:16 2025
Author
*
:
Subject
*
:
<p>BB7 is still connected but not biased (same configuration as the previous elog). The channel of the CAEN power supply #0 is connected to ASIC08 and biased at 100V. The channel of the CAEN power supply #1 is disconnected but still biased at 100V. AIDA04 (chained to AIDA05) is biased via a shielded cable to an iseg NHQ 246L power supplied, biased at 101 V with 16 uA.</p> <p>All the outside drain wires of bplast are now taped to the snout.</p> <p>Attachment 1: AIDA05.1.8L --> FWHM 60 channels</p> <p>Attachment 2: AIDA05.1.1L --> FWHM 51 channels</p> <p>Attachment 3: AIDA05.1.4L --> FWHM 57 channels</p> <p>Attachment 4: AIDA05.1.12L --> FWHM 65 channels</p> <p>Attachment 5: AIDA05.1.15L --> FWHM 69 channels</p> <p>Attachment 6: AIDA13.1.8L --> FWHM 277 channels, chosen because same place than AIDA05 but for the dowstream detector that is still biased with the CAEN module</p> <p>Attachment 7: AIDA12.1.8L --> FWHM 88 channels, chosen because same place than AIDA05 but of the bottom of upstream detector that is still biased with the iseg module</p> <p>Attachment 8: AIDA16.1.8L --> FWHM 133 channels, chosen because same place than AIDA05 of the bottom of dowstream detector that is still biased with the CAEN module. This curve has 2 humps</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.3-7933898