| <p>BB7 is still connected but not biased (same configuration as the previous elog). The channel of the CAEN power supply #0 is connected to ASIC08 and biased at 100V. The channel of the CAEN power supply #1 is disconnected but still biased at 100V. AIDA04 (chained to AIDA05) is biased via an <strong>unshielded</strong> cable to an iseg NHQ 246L power supplied, biased at 100 V with 15 uA.</p>
<p>All the outside drain wires of bplast are now taped to the snout.</p>
<p>The red markers of the cursors of the previous test have been left for ease of comparison.</p>
<p>Attachment 1: AIDA05.1.8L --> FWHM 67 channels</p>
<p>Attachment 2: AIDA05.1.1L --> FWHM 69 channels</p>
<p>Attachment 3: AIDA05.1.4L --> FWHM 79 channels</p>
<p>Attachment 4: AIDA05.1.12L --> FWHM 79 channels</p>
<p>Attachment 5: AIDA05.1.15L --> FWHM 79 channels</p>
<p>Attachment 6: AIDA13.1.8L --> FWHM 236 channels, chosen because same place than AIDA05 but for the dowstream detector that is still biased with the CAEN module</p>
<p>Attachment 7: AIDA12.1.8L --> FWHM 91 channels, chosen because same place than AIDA05 but of the bottom of upstream detector that is still biased with the iseg module</p>
<p>Attachment 8: AIDA16.1.8L --> FWHM 143 channels, chosen because same place than AIDA05 of the bottom of dowstream detector that is still biased with the CAEN module. This curve has 2 humps</p> |