AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
DESPEC
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Thu Jul 24 15:50:01 2025
Author
*
:
Subject
*
:
<p>HT of upstream AIDA from iseg, <strong>HT cable shielded</strong>, 100V, 17 uA. HT of downstream AIDA from CAEN, AIDA#0. Both channel 0 and 1 of CAEN are on, even though there is just one channel connected. DEGAS platform closed. The crates of BB7 and bplast have been put to the ground of the AIDA's structure (cupper sheet)</p> <p>Attachment 1: <em>TEST1</em>: BB7 fully connected = 2 tiles of BB7 have been connected to the mesytec preamps. BB7 is not biased. The mesytec preamps have been fully connected and supplied but 6/8 black cables are not connected on the other side. 4X and 4Y are connected to the 2 FEBEX cards. The cables of BB7 right between the snout and the preamps are shielded.</p> <p>AIDA05.1.8L --> FWHM 76-80 channels</p> <p>Attachment 2: <em>TEST2</em>: BB7 fully disconnected</p> <p>AIDA05.1.8L --> FWHM 71 channels</p> <p>Attachment 3: <em>TEST3</em>: BB7 fully disconnected, TAMEX crate unbiased, BB7 NIM crate turned off</p> <p>AIDA05.1.8L --> FWHM 67 channels</p> <p>Attachment 4: AIDA01.1.0 --> FWHM 171 channels --> same detector, also biased with iseg but bad results</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
Screenshot_from_2025-07-24_16-49-27.png
Original size: 1919x832
Attachment 2:
Screenshot_from_2025-07-24_17-03-44.png
Original size: 1918x833
Attachment 3:
Screenshot_from_2025-07-24_17-22-49.png
Original size: 1918x831
Attachment 4:
Screenshot_from_2025-07-24_17-29-38.png
Original size: 1917x829
Attachment 5:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown