Wed Oct 15 09:41:24 2025
Author
*
:
Subject
*
:
We have dismounted the AIDA stack and bPlast and realigned the cables so that they can fit into the adapters. The plan for the next couple days is the following: - Alignment -- done - Remount cable -- done - Fix position w/o bPlast mounted -- done - Remount bracket for the last stage -- done - Remount AIDA 1 & 2 and the 207Bi source with the source holder -- done - Mount the snout and take data -- we wait till next week Monday when the heat exchanger is active again. (ongoing) The current setup at the end of work is that the snout is mount with a bPlast (uncabled) and 2 AIDA layers at the regular spaced position with a 207Bi source down stream, as can be seen in the previous elog. The source is ~1 cm away from the middle AIDA wafer. Currently what is cabled: - Signal out from the detector - Bias daisy chain Still to be cabled: - HV cable - Grounding - Pulser Additional info on the source position: - the source is at ~9.6 mm distance from the downstream detector - the source is placed at the centre of the middle wafer: 12.25 cm in x, 4.75 cm in y - the radius of the source is ~1.5 mm
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
IMG_5796.jpg
Original size: 5712x4284
Attachment 2:
IMG_5797.jpg
Original size: 5712x4284
Attachment 3:
IMG_5798.jpg
Original size: 5712x4284
Attachment 4:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.3-7933898