AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
DESPEC
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Thu Dec 18 06:04:01 2025
Author
*
:
Subject
*
:
> > We have dismounted the AIDA stack and bPlast and realigned the cables so that they can fit into the adapters. > > The plan for the next couple days is the following: > > - Alignment -- done > - Remount cable -- done > - Fix position w/o bPlast mounted -- done > - Remount bracket for the last stage -- done > - Remount AIDA 1 & 2 and the 207Bi source with the source holder -- done > - Mount the snout and take data -- we wait till next week Monday when the heat exchanger is active again. (ongoing) > > The current setup at the end of work is that the snout is mount with a bPlast (uncabled) and 2 AIDA layers at the regular spaced position with a 207Bi source down stream, as can be seen in the previous elog. The source is ~1 cm away from the middle AIDA wafer. > > Currently what is cabled: > > - Signal out from the detector > - Bias daisy chain > > Still to be cabled: > > - HV cable > - Grounding > - Pulser > > Additional info on the source position: > - the source is at ~9.6 mm distance from the downstream detector > - the source is placed at the centre of the middle wafer: 12.25 cm in x, 4.75 cm in y > - the radius of the source is ~1.5 mm
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.3-7933898