AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
DESPEC
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Fri Nov 7 14:46:37 2025
Author
*
:
Subject
*
:
<p>Inspection of side FEEs (2,6,4,8) and possible grounding improvements:</p> <p>- all screws and nuts for copper connections were tightenedFee</p> <p>- FEE 6 was isolated from the copper connection grounding FEE2 with insulating tape (attachment 1)</p> <p>- A piece of tape was found below FEE6 (attachments 2,3) --> shall this be removed?</p> <p> </p> <p>Bias and power on of FEES, preparation of two settings with lower thresholds:</p> <p>- note: cannot calibrate ADC of aida15 even after trying multiple times (?)</p> <p>- 500-keV thresholds settings saved as EXPERIMENTS/AIDA/2025Oct29-09.49.01</p> <p>- 200-keV thresholds settings saved as EXPERIMENTS/AIDA/2025Oct29-09.55.31</p> <p> </p> <p> </p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.3-7933898