| <p>Inspection of side FEEs (2,6,4,8) and possible grounding improvements:</p>
<p>- all screws and nuts for copper connections were tightenedFee</p>
<p>- FEE 6 was isolated from the copper connection grounding FEE2 with insulating tape (attachment 1)</p>
<p>- A piece of tape was found below FEE6 (attachments 2,3) --> shall this be removed?</p>
<p> </p>
<p>Bias and power on of FEES, preparation of two settings with lower thresholds:</p>
<p>- note: cannot calibrate ADC of aida15 even after trying multiple times (?)</p>
<p>- 500-keV thresholds settings saved as EXPERIMENTS/AIDA/2025Oct29-09.49.01</p>
<p>- 200-keV thresholds settings saved as EXPERIMENTS/AIDA/2025Oct29-09.55.31</p>
<p> </p>
<p> </p> |