AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC  ELOG logo
Message ID: 744     Entry time: Thu Nov 13 10:14:50 2025
Author: JB, MP 
Subject: Noise conditions after removal of bPlast cabling 

JB has removed unnecessary cables and items from the snout and platform:

- the bPlast cables and booster boards were removed

- crate below the AIDA frame was disconnected from the power supply

- BB7 cables were removed

- power supply for the booster boards was removed

 

We switch on the system and check the noise conditions.

We started up. BIAS OK. TEMPS OK.

Thresholds initially set to 100 keV.

Rates in all FEEs are > 200 kHZ. Attachment 6.

We then checked the pulser peak widths in aida14. --> 192 channels with 1 V 1x attenuation. at 700 keV threshold (attachment 3). At 100 keV threshold the peak width was significantly higher!!! ---> 385 channels (attachment 2)

We checked the rates in the FEEs with the 700 keV thresholds (attachment 11).

Furthermore, we checked the constant noise that appears to be present in the y FEEs aida02,04,06,08. This can be seen in attachment 8 and has been noted in previous elogs https://elog.ph.ed.ac.uk/DESPEC/727

Info on current status of ion catcher: vacuum system is ON, electronics is also on (RF ~2MHz) on the side opposite to the DESPEC setup

Attachment 1: Screenshot_from_2025-11-13_11-17-27.png  39 kB  | Hide | Hide all
Screenshot_from_2025-11-13_11-17-27.png
Attachment 2: Screenshot_from_2025-11-13_11-41-48.png  210 kB  | Hide | Hide all
Screenshot_from_2025-11-13_11-41-48.png
Attachment 3: Screenshot_from_2025-11-13_11-39-30.png  211 kB  | Hide | Hide all
Screenshot_from_2025-11-13_11-39-30.png
Attachment 4: Screenshot_from_2025-11-13_11-34-29.png  200 kB  | Hide | Hide all
Screenshot_from_2025-11-13_11-34-29.png
Attachment 5: Screenshot_from_2025-11-13_11-33-38.png  196 kB  | Hide | Hide all
Screenshot_from_2025-11-13_11-33-38.png
Attachment 6: Screenshot_from_2025-11-13_11-33-13.png  128 kB  | Hide | Hide all
Screenshot_from_2025-11-13_11-33-13.png
Attachment 7: Screenshot_from_2025-11-13_11-29-41.png  159 kB  | Hide | Hide all
Screenshot_from_2025-11-13_11-29-41.png
Attachment 8: Screenshot_from_2025-11-13_11-53-18.png  169 kB  | Hide | Hide all
Screenshot_from_2025-11-13_11-53-18.png
Attachment 9: Screenshot_from_2025-11-13_11-50-53.png  150 kB  | Hide | Hide all
Screenshot_from_2025-11-13_11-50-53.png
Attachment 10: Screenshot_from_2025-11-13_11-47-30.png  178 kB  | Hide | Hide all
Screenshot_from_2025-11-13_11-47-30.png
Attachment 11: Screenshot_from_2025-11-13_11-45-30.png  128 kB  | Hide | Hide all
Screenshot_from_2025-11-13_11-45-30.png
ELOG V3.1.3-7933898