AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 12 of 35  ELOG logo
ID Date Authordown Subject Text Attachments
  686   Thu Jan 9 16:25:51 2025 TDLEC fast comparator threshold too low
LEC fast comparator has been set to 0x2 (200keV)
which is *very* low and means the fast comparator
 Screenshot_from_2025-01-09_17-28-45.png 
  687   Thu Jan 9 17:36:50 2025 TDLEC fast comparator threshold too low
> LEC fast comparator has been set to 0x2
(200keV) which is *very* low and means the
  
  688   Thu Jan 9 17:56:14 2025 TDLEC fast comparator threshold too low> > 
> > LEC fast comparator has been set to 0x2
(200keV) which is *very* low and means the
  
  689   Fri Jan 10 10:03:43 2025 TDLEC fast comparator threshold too low> > > 
> > > LEC fast comparator has been set to
0x2 (200keV) which is *very* low and means
  
  690   Sat Jan 11 14:05:03 2025 TDSaturday 11 January 2024
14.37 Detector bias & leakage current OK
- attachment 1
 17x 
  691   Sat Jan 11 14:14:21 2025 TDaida06 crashed and rebooted 10.1.25aida06 crashed and rebooted sometime ( 14:48
- 23:25 ) yesterday. System console log appended.
  
  692   Mon Jan 13 11:32:30 2025 TDOffline analysis S505 data file R3_150Offline analysis of S505 data files R3_150

first WR ts
 22x 
  693   Mon Jan 13 17:38:18 2025 TDOffline analysis of S505 data files
First timestamp of R2_105 0x16FAEC5E54AABF6C
 10x 
  694   Wed Jan 15 11:58:08 2025 TDOffline analysis data files S505 R3_9 - R3_128 (207Hg setting)
Aanlysis data files R3_9 - R3_128 (207Hg
setting)
 27x 
  698   Wed Feb 12 10:46:01 2025 TDOffline analysis data files S181 R4_351-396 Analysis data files R4_351-396

 25x 
  700   Sat Feb 22 12:35:38 2025 TDOffline analysis data files R9_85-R9_199 (84Mo setting)
Start 00:43 22.2.25 https://elog.gsi.de/despec/G-24-00302/57
AIDA data file R9_85
 22x 
  701   Tue Mar 11 11:53:18 2025 TDMonday 10 March
18.30 AIDA powered up for brief test
 11x 
  702   Tue Apr 8 08:52:39 2025 TDAIDA grounding
AIDA DSSSDs and FEE64-DSSSD cabling are electrically
isolated (by design) from snout, mounting
 powerstax-ms1u_instructionmanua.pdf20250408_095624.jpg 
  154   Mon Mar 16 01:07:29 2020 TA, AM, ESRegular entry
02:14 all system wide checks okay 

     FEE temperatures okay 
      leakage
currents okay and recorded to spreadsheet
 13x 
  155   Mon Mar 16 05:08:12 2020 TA, AM, ESRegular entry
02:14 all system wide checks okay 

     FEE temperatures okay 
      leakage
currents okay and recorded to spreadsheet
 6x 
  660   Thu Jun 13 21:06:44 2024 Robert Page16:00 to 00:00 shift on 13/6/2024Elog went down around the end of the last
shift, so final screenshots were not uploaded
at that point.
 26x 
  461   Mon May 16 15:12:50 2022 RDP, MAMonday 16th May 16:00-00:0016:00 Took over the shift from Magda.

17:30 Updates: Attached (1-3)

19:30 Updates: Attached (4-6)
 12x 
  246   Mon Apr 19 13:27:08 2021 RDPMonday 19th April 12 noon shift
12.30 There appear to be fewer HEC events
in aida09 cf. aida11 and upstream DSSSDs
 61.pngScreenshot_2021-04-19_Temperature_and_status_scan_aidas-gsi(2).pngScreenshot_2021-04-19_Statistics_aidas-gsi(2).png 
  331   Wed May 19 11:24:55 2021 RDPMonday 19 April 12 noon shiftSystem checks gave 11 passed/1 failed, except
for ADC timimgs: 10 passed/2 failed.
 Screenshot_2021-04-19_Temperature_and_status_scan_aidas-gsi(3).pngScreenshot_2021-04-19_Tape_Service_(Expert)_aidas-gsi.png62.png 
  610   Fri Apr 26 15:34:00 2024 RDP16:00 - 00:00 Friday 26 AprilThis appeared in the system log:

Apr 26 16:30:51 aidas-gsi smartd[1076]:
Device: /dev/sda [SAT], 1 Currently unreadable
 6x 
ELOG V3.1.4-unknown