AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
DTAS
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Fri Nov 1 01:29:00 2024
Author
*
:
Subject
*
:
<p>Signal cables (long cables, from preamp to digitizer) of channels 13 and 16 were changed. For the moment they have not been relabelled.</p> <p>We assumed that it was not a HV supply or cable problem, since the anods were aligned and only the dynodes moved.</p> <p>After changing the cables we realigned the dynodes and recalibrated all signals. Screen shots are attached.</p> <p>File (root file) with the two sources (Co and Cs) saved as 201905151432_137Cs60Co.root</p> <p>Configuration file: 20190515_Conf.xlsx</p> <p>Rate with two sources: 52 kHz (Dynodes), 47 kHz (Anodes)</p> <p> </p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown