AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DTAS, Page 8 of 8  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Mon Jun 3 12:59:31 2019, A. Algora, Background, beam on, 102Sn coulex 201906041423_background_AIDA_in.root
Start: 21:00

Stop: 14:24 (next day)

Root: 201906041423_background_AIDA_in.root
Entry  Tue Jun 4 06:25:51 2019, A. Algora, Lead shielding was "upgraded" 
With the help of Tom the additional lead pieces were put. So now the hole in the lead shielding matches the hole in the polyethylene shielding.

The hole is 11 cm x 11 cm approximately

 
ELOG V3.1.4-unknown