AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  EDI_PSA  ELOG logo
Message ID: 28     Entry time: Wed Jun 14 11:30:42 2023
Author: Lucia B, Carlo B 
Subject: LNL6-LNL2-LNL9 

On 13/06/2023 afternoon we dismounted LNL6 sputtered target and mounted LNL2 (identical to LNL1, one Cr layer). We performed a scan of E_res=309 keV and left overnight under beam. In the morning 14/06/2023 we repeated the scan: the plateau has increased by 50% in height, but was much shorter. After dismounting, we notice witish dots around the beam spot.

We then mounted LNL9 (sputtered) and performed a scan. Very short plateau. We left for a long run.

Pictures of the targets attached (LNL6 after- LNL2 before and after - LNL9 before).

Attachment 1: LNL6_after_front.jpg  2.036 MB  Uploaded Wed Jun 14 17:01:18 2023  | Hide | Hide all
LNL6_after_front.jpg
Attachment 2: LNL6_after_back.jpg  3.178 MB  Uploaded Wed Jun 14 17:02:11 2023  | Hide | Hide all
LNL6_after_back.jpg
Attachment 3: LNL6_after_back2.jpg  2.318 MB  Uploaded Wed Jun 14 17:02:39 2023  | Hide | Hide all
LNL6_after_back2.jpg
Attachment 4: LNL2_before.jpg  86 kB  Uploaded Wed Jun 14 17:04:10 2023  | Hide | Hide all
LNL2_before.jpg
Attachment 5: LNL2_after.jpg  2.362 MB  Uploaded Wed Jun 14 17:04:49 2023  | Hide | Hide all
LNL2_after.jpg
Attachment 6: LNL2_after_back.jpg  1.430 MB  Uploaded Wed Jun 14 17:05:31 2023  | Hide | Hide all
LNL2_after_back.jpg
Attachment 7: LNL9_before.jpg  1.746 MB  Uploaded Wed Jun 14 17:06:11 2023  | Hide | Hide all
LNL9_before.jpg
ELOG V3.1.4-unknown