Entry time:
Sat May 18 20:12:35 2024
Author
*
:
Subject
*
:
<p>On 15/06/2023 morning, around 6:32 am, a powercut caused failure in the Compresed Air Pressure system. Faraday cup was closed by the interlock and the HV was turned off.</p> <p>We turned off the accelerator, dismounted LNL9 (pictures attached) and mounted Ta1 Edi backing. We left only ACP28 pump on. We also switched off GeBo HV and its cryocooler.</p> <p>All details can be found in the excel sheet attached to entry 24.</p>