AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
EDI_PSA
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Fri Jun 16 10:42:38 2023
Author
*
:
Subject
*
:
<p>On 15/06/2023 morning, around 6:32 am, a powercut caused failure in the Compresed Air Pressure system. Faraday cup was closed by the interlock and the HV was turned off.</p> <p>We turned off the accelerator, dismounted LNL9 (pictures attached) and mounted Ta1 Edi backing. We left only ACP28 pump on. We also switched off GeBo HV and its cryocooler.</p> <p>All details can be found in the excel sheet attached to entry 24.</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
LNL9_front.jpg
Original size: 1984x1488
Attachment 2:
LNL9_back.jpg
Original size: 1984x1488
Attachment 3:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown