AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  GELINA  ELOG logo
Message ID: 1     Entry time: Thu Sep 25 14:15:32 2014
Author: Tom Davinson 
Subject: Current experimental configuration 
GELINA, JRC IRMM Geel 26Al(n,p) and 26Al(n,alpha) experimental configuration 
- notes from December 2013.
Attachment 1: gelina_001.jpg  356 kB  | Hide | Hide all
gelina_001.jpg
Attachment 2: gelina_002.jpg  554 kB  | Hide | Hide all
gelina_002.jpg
Attachment 3: gelina_003.jpg  390 kB  | Hide | Hide all
gelina_003.jpg
Attachment 4: gelina_004.jpg  563 kB  | Hide | Hide all
gelina_004.jpg
Attachment 5: gelina_005.jpg  332 kB  | Hide | Hide all
gelina_005.jpg
Attachment 6: gelina_006.jpg  539 kB  | Hide | Hide all
gelina_006.jpg
Attachment 7: gelina_007.jpg  298 kB  | Hide | Hide all
gelina_007.jpg
Attachment 8: gelina_008.jpg  552 kB  | Hide | Hide all
gelina_008.jpg
Attachment 9: gelina_009.jpg  346 kB  | Hide | Hide all
gelina_009.jpg
ELOG V3.1.4-unknown