Header: 3.99 MeV/u and CH2_30+25. Beam is back
Ender:
====================================================
Run number : 92
Date : 11/11/17
Start time : 12:22:50
Stop time : 12:50:13
Trigger rate (MIDAS) : 2-4
Blocks written : 14
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 3
1- Gated : 3
2- dE : 140k
3- E : 69
4- HI : 686
5- Pulser : 2
6- Clock : 970
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 3.99 MeV/u
Beam intensity (epA) :
Target : CH2_30+25 (Pos#6; 490-520 ug/cm2)
Ladder position (mm) : 67.26
HI Degrader foil (um) : 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.67
E voltage (V) : -350
E leakage (uA) : 2.11
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.50
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : -0.55
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : -0.28
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 7.2 E-06
Pressure (old gauge) (mbar) : 2.1 E-05
Pressure (SEC) (mbar) : 4.0 E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -9.9
Temp (chamber) deg : 5.4
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: Run had to be stopped early because some parts of the accelerator tripped. Miguel sorted it out remotely.
==================================================== |