Header: 3.99 MeV/u and C_25.
Ender: We stop because the lasers are being cleaned, and we saw the scalars drop. See Comment below.
====================================================
Run number : 93
Date : 11/11/17
Start time : 15:09:09
Stop time : 16:08:46
Trigger rate (MIDAS) : 3
Blocks written : 35
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 3
1- Gated : 3
2- dE : 134k
3- E : 52
4- HI : 559
5- Pulser : 2
6- Clock : 970
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 3.99 MeV/u
Beam intensity (epA) : ~1.5 pA
Target : C_25 (Pos#3; 430-500 ug/cm2)
Ladder position (mm) : 112.78
HI Degrader foil (um) : 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.67
E voltage (V) : -350
E leakage (uA) : 2.11
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.53
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : -0.55
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : -0.28
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 7.1 E-06
Pressure (old gauge) (mbar) : 2.0 E-05
Pressure (SEC) (mbar) : 4.0 E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.1
Temp (chamber) deg : 5.5
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: At around 16:00, the laser team goes in to do some cleaning. We are continuing to run while watching our scalars.
==================================================== |