Header: Continue with 4.0 MeV/u Empty Frame
Ender:
====================================================
Run number : 96
Date : 11 / 11 / 2017
Start time : 18:09:43
Stop time : 18:40
Trigger rate (MIDAS) :
Blocks written : 0 blocks written, it says.
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 0 (actually ~0.1 Hz)
1- Gated : 0 (actually ~0.1 Hz)
2- dE : 150k
3- E : 30
4- HI : 37
5- Pulser : 2
6- Clock : 968
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : Nominal 4.0 MeV/u
Beam intensity (epA) :
Target : Empty Frame
Ladder position (mm) : 52.09
HI Degrader foil (um) : 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.67
E voltage (V) : -350
E leakage (uA) : 2.10
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.57
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.55
PA power (Down, positive) (A) : 0.79
PA power (Down, negative) (A) : 0.25
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.9 x 10^-6
Pressure (old gauge) (mbar) : 2.0 x 10^-5
Pressure (SEC) (mbar) : 3.9 x 10^-6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.0
Temp (chamber) deg : 5.9 ~ 6.0
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: Increased pulser rate to 250 Hz after the run, to flush the previous buffer in the Tape Server.
See run 97
==================================================== |