Header: CH2 target in, Laser #2 off, 4.0 MeV/u
Ender: ends OK
====================================================
Run number : 98
Date : 11 / 11 / 2017
Start time : 18:55
Stop time : 19:23
Trigger rate (MIDAS) : 24
Blocks written : 1089
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 24
1- Gated : 24
2- dE : 142k
3- E : 62
4- HI : 42
5- Pulser : 24
6- Clock : 969
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 4.0 MeV/u nominal
Beam intensity (epA) : 0.05 to 0.06
Target : CH_2 30+25
Ladder position (mm) : 67.26
HI Degrader foil (um) : 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : -0.67
E voltage (V) : -350
E leakage (uA) : -2.10
E_hi voltage (V) : -14
E_hi leakage (uA) : -2.67
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.5
PA power (Up, negative) (A) : 0.55
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.25
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.9E-6
Pressure (old gauge) (mbar) : 1.95E-5
Pressure (SEC) (mbar) : 3.9E-6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.1
Temp (chamber) deg : +5.8
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: DAQ trigger changed to OR( E p+n strips) .OR. PRE-SCALED-OR( E_HI p+n strips ) .OR. Pulser
==================================================== |