AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
ISOLDE
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Mar 29 07:36:38 2025
Author
*
:
Subject
*
:
Header: Continue CH2 at 4.0 MeV/u Ender: ==================================================== Run number : 100 Date : 11 / 11 / 2017 Start time : 21:28 Stop time : 00:27 Trigger rate (MIDAS) : 6 Blocks written : 784 —————————————————————————————— Run Scalars (approx rates) 0- Ungated : 4 1- Gated : 4 2- dE : 150k 3- E : 20 4- HI : 556 5- Pulser : 1 6- Clock : 968 —————————————————————————————— Beam energy (MeV/u) : 4.0 MeV/u (nominal) Beam intensity (epA) : 1.75 Target : CH2 30+25 Ladder position (mm) : 67.26 HI Degrader foil (um) : 10 um Al —————————————————————————————— del_E voltage (V) : -40 del_E leakage (uA) : 0.68 E voltage (V) : -350 E leakage (uA) : 2.10 E_hi voltage (V) : -14 E_hi leakage (uA) : 2.59 —————————————————————————————— PA power (Up, positive) (A) : 1.55 PA power (Up, negative) (A) : 0.55 PA power (Down, positive) (A) : 0.8 PA power (Down, negative) (A) : 0.25 —————————————————————————————— Pressure (IMG1) (mbar) : 6.8 x 10^-6 Pressure (old gauge) (mbar) : 1.9 x 10^-5 Pressure (SEC) (mbar) : 3.8 x 10^-6 —————————————————————————————— Temp (Chiller) deg : -9.9 Temp (chamber) deg : 6.0 —————————————————————————————— Comments: At 21:57, we are notified by RILIS team that they would like to do some cleaning and laser maintenance before leaving for the night. It should take 15 minutes. We will watch the scalars but continue the run. 22:14 beam is off. 22:18 the laser tuning is finished. ====================================================
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown