AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
ISOLDE
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Fri Mar 28 20:53:36 2025
Author
*
:
Subject
*
:
> Header: Continue CH2 at 4.0 MeV/u > Ender: > ==================================================== > Run number : 100 > Date : 11 / 11 / 2017 > Start time : 21:28 > Stop time : 00:27 > Trigger rate (MIDAS) : 6 > Blocks written : 784 > 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 > Run Scalars (approx rates) > 0- Ungated : 4 > 1- Gated : 4 > 2- dE : 150k > 3- E : 20 > 4- HI : 556 > 5- Pulser : 1 > 6- Clock : 968 > 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 > Beam energy (MeV/u) : 4.0 MeV/u (nominal) > Beam intensity (epA) : 1.75 > Target : CH2 30+25 > Ladder position (mm) : 67.26 > HI Degrader foil (um) : 10 um Al > 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 > del_E voltage (V) : -40 > del_E leakage (uA) : 0.68 > E voltage (V) : -350 > E leakage (uA) : 2.10 > E_hi voltage (V) : -14 > E_hi leakage (uA) : 2.59 > 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 > PA power (Up, positive) (A) : 1.55 > PA power (Up, negative) (A) : 0.55 > PA power (Down, positive) (A) : 0.8 > PA power (Down, negative) (A) : 0.25 > 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 > Pressure (IMG1) (mbar) : 6.8 x 10^-6 > Pressure (old gauge) (mbar) : 1.9 x 10^-5 > Pressure (SEC) (mbar) : 3.8 x 10^-6 > 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 > Temp (Chiller) deg : -9.9 > Temp (chamber) deg : 6.0 > 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 > Comments: At 21:57, we are notified by RILIS team that they would like to do some cleaning and laser maintenance before leaving for the night. It should take 15 minutes. We > will watch the scalars but continue the run. 22:14 beam is off. 22:18 the laser tuning is finished. > ====================================================
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown