Header: CH2 #30+25, Beam energy 4.0 MeV/u
Ender:
====================================================
Run number : 101
Date : 12/11/2017
Start time : 00:27
Stop time : 02:29
Trigger rate (MIDAS) : 6
Blocks written : 484
——————————————————————————————
Run Scalars (approx rates)
0- Ungated : 4
1- Gated : 4
2- dE : 146151
3- E : 16
4- HI : 654
5- Pulser : 1
6- Clock : 968
——————————————————————————————
Beam energy (MeV/u) : 4.0
Beam intensity (epA) : 1.75
Target : CH2 30+25
Ladder position (mm) : 67.26
HI Degrader foil (um) : 10 um Al
——————————————————————————————
del_E voltage (V) : -40
del_E leakage (uA) : 0.69
E voltage (V) : -350
E leakage (uA) : 2.1
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.64
——————————————————————————————
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.6
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.28
——————————————————————————————
Pressure (IMG1) (mbar) : 6.6E-06
Pressure (old gauge) (mbar) : 1.9E-05
Pressure (SEC) (mbar) : 3.7E-06
——————————————————————————————
Temp (Chiller) deg : -10
Temp (chamber) deg : 5.9
——————————————————————————————
Comments:
==================================================== |