Header: CH2 #30+25, Beam energy 4.0 MeV/u
Ender: Run stopped short as the RF cavity tripped
====================================================
Run number : 102
Date : 12/11/2017
Start time : 02:29
Stop time : 02:35
Trigger rate (MIDAS) : 2 Hz
Blocks written : 23
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 1
1- Gated : 1
2- dE : 145957
3- E : 17
4- HI : 3
5- Pulser : 2
6- Clock : 968
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) :
Beam intensity (epA) : 0.05
Target :
Ladder position (mm) :
HI Degrader foil (um) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) :
del_E leakage (uA) :
E voltage (V) :
E leakage (uA) :
E_hi voltage (V) :
E_hi leakage (uA) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) :
PA power (Up, negative) (A) :
PA power (Down, positive) (A) :
PA power (Down, negative) (A) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) :
Pressure (old gauge) (mbar) :
Pressure (SEC) (mbar) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg :
Temp (chamber) deg :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |