Header: CH2 #30+25, beam energy 4.0 MeV/u
Ender: Run stopped as the beam went off. Noticed on the HI det scalar
====================================================
Run number : 103
Date : 12/11/2017
Start time : 02:42
Stop time : 04:17
Trigger rate (MIDAS) : 4
Blocks written : 415
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 4
1- Gated : 4
2- dE : 140503
3- E : 18
4- HI : 767
5- Pulser : 1
6- Clock : 968
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 4.0 MeV/u
Beam intensity (epA) : 2.0
Target : CH2 30+25
Ladder position (mm) : 67.26
HI Degrader foil (um) : 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.69
E voltage (V) : -350
E leakage (uA) : 2.1
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.64
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.6
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.29
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.5E-06
Pressure (old gauge) (mbar) : 1.9E-05
Pressure (SEC) (mbar) : 3.7E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.0
Temp (chamber) deg : 5.9
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |