AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
ISOLDE
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Mon Mar 31 12:09:12 2025
Author
*
:
Subject
*
:
Header: 4.29MeV/u 59Cu20+ + (CH2)n #16 Ender: ==================================================== Run number : 107 Date : 12.11.17 Start time : 10.18 Stop time : 12:18:52 Trigger rate (MIDAS) : 5 Blocks written : 514 Run Scalers (approx rates) 0- Ungated : 4 1- Gated : 4 2- dE : 120k 3- E : 27 4- HI : 719 5- Pulser : 1 6- Clock : 969 Beam energy (MeV/u) : 4.4 Beam intensity (epA) : Target : (CH2)n #16 Ladder position (mm) : 128.95* HI Degrader foil (um) : 10 um Al del_E voltage (V) : -40 del_E leakage (uA) : -0.78 E voltage (V) : -350 E leakage (uA) : -2.12 E_hi voltage (V) : -14 E_hi leakage (uA) : -2.71 PA power (Up, positive) (A) : 1.55 PA power (Up, negative) (A) : 0.55 PA power (Down, positive) (A) : 0.8 PA power (Down, negative) (A) : 0.25 Pressure (IMG1) (mbar) : 6.3E-06 Pressure (old gauge) (mbar) : 1.8E-05 Pressure (SEC) (mbar) : 3.5E-06 Temp (Chiller) deg : -10 Temp (chamber) deg : 5.8 Comments: Dimo cleans laser c. 10.20-10.35 ==================================================== * target ladder reading by Tom 128.95, by Claudia 127.95 and Phil says ~128. True position depends how good the marker is lining up with scale
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown