Header: 4.29MeV/u 59Cu20+ + (CH2)n #16
Ender: End
====================================================
Run number : 109
Date : 12.11.17
Start time : 14:25:46
Stop time : 16:26:07
Trigger rate (MIDAS) : 5
Blocks written : 505
Run Scalers (approx rates)
0- Ungated : 3
1- Gated : 3
2- dE : 124k
3- E : 35
4- HI : 608
5- Pulser : 2
6- Clock : 969
Beam energy (MeV/u) : 4.29 (as determined by operators)
Beam intensity (epA) :
Target : (CH2)n #16
Ladder position (mm) : 127.95
HI Degrader foil (um) : 10 um Al
del_E voltage (V) : -40
del_E leakage (uA) : -0.77
E voltage (V) : -350
E leakage (uA) : -2.11
E_hi voltage (V) : -14
E_hi leakage (uA) : -2.73
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.55
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.25
Pressure (IMG1) (mbar) : 6.1E-06
Pressure (old gauge) (mbar) : 1.8E-05
Pressure (SEC) (mbar) : 3.4E-06
Temp (Chiller) deg : -10
Temp (chamber) deg : 6.1
Comments:
====================================================
|