AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE  ELOG logo
Message ID: 123     Entry time: Sun Nov 12 13:24:51 2017
Author: CLW, PJW 
Subject: Run 109 
Header: 4.29MeV/u 59Cu20+ + (CH2)n #16 
Ender: End
====================================================
Run number			: 109
Date				: 12.11.17
Start time			: 14:25:46
Stop time			: 16:26:07
Trigger rate (MIDAS)	        : 5
Blocks written		        : 505

Run Scalers (approx rates)
0- Ungated                      : 3
1- Gated                        : 3
2- dE                           : 124k
3- E                            : 35
4- HI                           : 608
5- Pulser                       : 2
6- Clock			: 969

Beam energy (MeV/u)		: 4.29 (as determined by operators)
Beam intensity (epA)	        : 
Target				: (CH2)n #16
Ladder position	(mm)	        : 127.95
HI Degrader foil (um)		: 10 um Al

del_E voltage (V)		: -40
del_E leakage (uA)		: -0.77
E voltage (V)			: -350
E leakage (uA)		        : -2.11
E_hi voltage (V)		: -14
E_hi leakage (uA)		: -2.73

PA power (Up, positive)	(A)	: 1.55
PA power (Up, negative) (A)     : 0.55
PA power (Down, positive) (A)	: 0.8
PA power (Down, negative) (A)   : 0.25

Pressure (IMG1)	(mbar)	        : 6.1E-06
Pressure (old gauge) (mbar)     : 1.8E-05
Pressure (SEC)	(mbar)         	: 3.4E-06

Temp (Chiller)	deg	        : -10
Temp (chamber)	deg	        : 6.1

Comments: 
====================================================

 
ELOG V3.1.4-unknown