AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE  ELOG logo
Message ID: 126     Entry time: Sun Nov 12 18:32:52 2017
Author: MB DK  
Subject: run 112 
Header: 4.4 MeV/u CH2_16 sample
Ender: 
====================================================
Run number			:   112
Date				:   12/11
Start time			:   19.32
Stop time			:   22.27
Trigger rate (MIDAS)	        :   3
Blocks written		        :   733
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated                      :   3
1- Gated                        :   3 
2- dE                           :   146000
3- E                            :   17
4- HI                           :   258
5- Pulser                       :   2
6- Clock			:   969
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u)		:   4.4 MeV/u
Beam intensity (epA)	        :   0.8 
Target				:   CH2_16
Ladder position	(mm)	        :   127.95 
HI Degrader foil (um)		:   10 mu
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V)		:   -40
del_E leakage (uA)		:   0.76
E voltage (V)			:   -350
E leakage (uA)		        :   2.10
E_hi voltage (V)		:   -14
E_hi leakage (uA)		:   2.76
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive)	(A)	:   1.55
PA power (Up, negative) (A)     :   0.55
PA power (Down, positive) (A)	:   0.8
PA power (Down, negative) (A)   :   0.28
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1)	(mbar)	        :   6.2E-6
Pressure (old gauge) (mbar)     :   1.8E-5
Pressure (SEC)	(mbar)         	:   3.6E-6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller)	deg	        :   -10.0
Temp (chamber)	deg	        :    5.8
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: data during first 5 mins of run were taken with sample at 126.95 mm rather than 127.95 mm
at 21:05, RILIS begins brief laser maintenance.  21:19 finished.
====================================================
ELOG V3.1.4-unknown