Header: Continue 4.4 MeV / u @ CH2
Ender: Run stopped short as the IHS tripped
====================================================
Run number : 115
Date : 13/11/2017
Start time : 00:52:06
Stop time : 01:06:27
Trigger rate (MIDAS) : 3
Blocks written : 58
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 3
1- Gated : 3
2- dE : 150k
3- E : 15
4- HI : 363
5- Pulser : 1
6- Clock : 969
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 4.4 MeV
Beam intensity (epA) :
Target : CH2_16
Ladder position (mm) : 127.95
HI Degrader foil (um) : 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.77
E voltage (V) : -350
E leakage (uA) : 2.09
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.80
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.59
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.28
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.3 x 10^-6
Pressure (old gauge) (mbar) : 1.7 x 10^-5
Pressure (SEC) (mbar) : 3.8 x 10^-6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.1
Temp (chamber) deg : +5.8
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |