Header: CH2 #16, beam energy 4.4 MeV/u
Ender: Run stopped short - IHS tripped
====================================================
Run number : 116
Date : 13/11/2017
Start time : 01:12
Stop time : o1:41:50
Trigger rate (MIDAS) : 4
Blocks written : 117
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 4
1- Gated : 4
2- dE : 155999
3- E : 15
4- HI : 351
5- Pulser : 2
6- Clock : 969
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 4.4
Beam intensity (epA) : 1.45
Target : CH2_16
Ladder position (mm) : 127.95
HI Degrader foil (um) : 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.77
E voltage (V) : -350
E leakage (uA) : 2.09
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.8
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 0.8
PA power (Up, negative) (A) : 0.3
PA power (Down, positive) (A) : 1.55
PA power (Down, negative) (A) : 0.6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.4E-06
Pressure (old gauge) (mbar) : 1.8E-05
Pressure (SEC) (mbar) : 3.8E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10
Temp (chamber) deg : 5.8
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |