Header: CH2 #33+10+01, beam energy 3.6
Ender: no beam at the start, so start afresh with run with continuour beam (hopefully)
====================================================
Run number : 126
Date : 13/11/2017
Start time : 15:37:38
Stop time : 16:07:35
Trigger rate (MIDAS) : 3
Blocks written : 128
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 5
1- Gated : 5
2- dE : 149k
3- E : 41
4- HI : 857
5- Pulser : 1
6- Clock : 970
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 3.6
Beam intensity (epA) : 1.3
Target : CH2 #33_10_01
Ladder position (mm) : 97.61
HI Degrader foil (um) : 10 Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.80
E voltage (V) : -350
E leakage (uA) : 2.08
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.84
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.55
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.25
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.2E-06
Pressure (old gauge) (mbar) : 1.7E-05
Pressure (SEC) (mbar) : 3.8E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.0
Temp (chamber) deg : 5.3
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: Laser intervention. No beam at start of run (first ~15 minutes).
==================================================== |