AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE  ELOG logo
Message ID: 166     Entry time: Wed Nov 15 03:25:08 2017
Author: MD,DK 
Subject: Run 152 
Header: Continue with 5.0 MeV/u on CH2_33+10+01
Ender: End
====================================================
Run number			: 152
Date				: 15 / 11 / 2017
Start time			: 04:19:13
Stop time			: 06:24:38
Trigger rate (MIDAS)	        : 4
Blocks written		        : 531
====================================================
Run Scalers (approx rates)
0- Ungated                      : 4
1- Gated                        : 4
2- dE                           : 61k
3- E                            : 131
4- HI                           : 478
5- Pulser                       : 1
6- Clock			: 969
====================================================
Beam energy (MeV/u)		: 5.0 MeV/u (nominal)
Beam intensity (epA)	        : 
Target				: CH2_33+10+01
Ladder position	(mm)	        : 97.61
HI Degrader foil (um)		: 15 um Al
====================================================
del_E voltage (V)		: -40
del_E leakage (uA)		: 0.68
E voltage (V)			: -350
E leakage (uA)		        : 2.07
E_hi voltage (V)		: -14
E_hi leakage (uA)		: 3.28
====================================================
PA power (Up, positive)	(A)	: 1.55
PA power (Up, negative) (A)     : 0.58
PA power (Down, positive) (A)	: 0.79
PA power (Down, negative) (A)   : 0.27
====================================================
Pressure (IMG1)	(mbar)	        : 7.9 x 10^-6
Pressure (old gauge) (mbar)     : 2.1 x 10^-5
Pressure (SEC)	(mbar)         	: 4.9 x 10^-6
====================================================
Temp (Chiller)	deg	        : -10.1
Temp (chamber)	deg	        : 5.6
====================================================
Comments: 
====================================================
ELOG V3.1.4-unknown