Header: Continue with CH2 and 5.0 MeV/u
Ender: end of beam time
====================================================
Run number : 153
Date : 15 / 11 / 2017
Start time : 06:24:46
Stop time : 08:29:53
Trigger rate (MIDAS) : 3
Blocks written : 532
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 4
1- Gated : 3
2- dE : 58k
3- E : 79
4- HI : 448
5- Pulser : 1
6- Clock : 969
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 5.0 MeV/u (nominal)
Beam intensity (epA) : 2.5
Target : CH2_33+10+01
Ladder position (mm) : 97.61
HI Degrader foil (um) : 15 um
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.69
E voltage (V) : -350
E leakage (uA) : 2.065
E_hi voltage (V) : -14
E_hi leakage (uA) : 3.30
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.59
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.28
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 7.7 x 10^-6
Pressure (old gauge) (mbar) : 2.0 x 10^-5
Pressure (SEC) (mbar) : 4.9 x 10^-6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.1
Temp (chamber) deg : +5.9
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |