AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
ISOLDE
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Thu Apr 3 19:29:03 2025
Author
*
:
Subject
*
:
Header: 4alpha source run for E det calubration Ender: ==================================================== Run number : 159 Date : 15/11/2017 Start time : 17:01:03 Stop time : 17:24:21 Trigger rate (MIDAS) : 6700 Blocks written : 23895 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 Run Scalers (approx rates) 0- Ungated : 30000 1- Gated : 9000 2- dE : 3- E : 4- HI : 5- Pulser : 6- Clock : 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 Beam energy (MeV/u) : Beam intensity (epA) : Target : 4alpha source Ladder position (mm) : 36.92 HI Degrader foil (um) : 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 del_E voltage (V) : del_E leakage (uA) : E voltage (V) : -350 E leakage (uA) : E_hi voltage (V) : E_hi leakage (uA) : 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 PA power (Up, positive) (A) : PA power (Up, negative) (A) : PA power (Down, positive) (A) : PA power (Down, negative) (A) : 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 Pressure (IMG1) (mbar) : Pressure (old gauge) (mbar) : Pressure (SEC) (mbar) : 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 Temp (Chiller) deg : Temp (chamber) deg : 覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧 Comments: Didn't note the leakage current, but it was all normal. ====================================================
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown