Header: Pulser walkthrough, E p-side
Ender: positive pulser, fall time 1ms, delay 250 ns, 6 V in steps of 0.5, 250 Hz
====================================================
Run number : 168
Date : 16/11/2017
Start time : 16:49:05
Stop time : 16:55:06
Trigger rate (MIDAS) : 7961
Blocks written : 8522
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 33k
1- Gated : 7k
2- dE :
3- E :
4- HI :
5- Pulser :
6- Clock :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) :
Beam intensity (epA) :
Target :
Ladder position (mm) :
HI Degrader foil (um) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.55
E voltage (V) : -350
E leakage (uA) : 2.53
E_hi voltage (V) : -14
E_hi leakage (uA) : 3.95
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) :
PA power (Up, negative) (A) :
PA power (Down, positive) (A) :
PA power (Down, negative) (A) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) :
Pressure (old gauge) (mbar) :
Pressure (SEC) (mbar) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg :
Temp (chamber) deg :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: Trigger on each pulser run OR between all strips of the detector to be measured.
==================================================== |