AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
ISOLDE
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Thu Apr 3 19:29:00 2025
Author
*
:
Subject
*
:
1 bolt for chamber stand structure, for reference for new struts. 2 target ladders: spare 1/2 style ladder, ladder from inside chamber, including the bits to connect to actuator 2 dual photodiode frames for degraders. (Existing at CERN are 3 more, with 10, 15, and 20 um Al foil over one side, respectively) Acrylic window from beam upstream (front) top of chamber, where gas feedthrough is meant to go.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown