AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE  ELOG logo
Message ID: 199     Entry time: Thu Oct 25 13:25:16 2018
Author: KG 
Subject: Current gas cell status 
(Wrapped up)

    Cell b : 15um Al exit, 12.5um Al entrance.  L/R ~0.4Torr/hr overnight (in vacuum)

    Cell d : 15um Al exit, 3um Ti entrance. L/R ~ 0.8Torr/hr overnight (in vacuum)

(In testing)

    Cell a : 15um Al exit, undecided which window will be used. At current epoxy on screw in joints for arms of cell. Testing in atmosphere to see if can reach adequate seal with this.
ELOG V3.1.4-unknown