AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
ISOLDE
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Thu Apr 3 19:29:13 2025
Author
*
:
Subject
*
:
NB: This list may be incomplete! CERN side: Beam operators hope for a FC which can be automated at the end of SEC: Olof ? Gain resistors (and other items) sent to CERN. Where are they? KJ has them? Check with Karl w26 PC needs to get online. Contact Olof when we return to ISOLDE to confirm the network port is still free. Daid. Need to register the device to CERN Dry N2 bottle: ask Karl Edinburgh side: Iris automated controls and mounts: in construction. Add additional stop so doesnt close all the way. Peter Cooling line chamber feed through: get spare. Peter Get Al degrader foil for heavy ions (~13 um), mount on dummy frame etc. probably fine from store. Should get 15 um for highest beam energy. With lowest beam energy we might need to change the foil: Daid Alpha spectral analysis: to be sorted. Daid, Claudia, Tom, Ruchi Sort routines for dE-E plots, etc, for online analysis: Tom Photo diodes x2 along with degrader foil: PCB for photodeiodes, PCB for photodiodes. extra holes for ladder. Peter Target ladder config finalization: 2 photodiodes, collimator (what size, we have 3 mm and 10mm), Beam viewer, We need to verify how many positions we have. Need at least 2 CH2 and 1 Carbon. Daid, Claudia Extra ribbon cables are needed? need to check with calibration. Also need long ribbon cables Beam viewer: see target ladder Faraday cup SHV to SMA converter: Peter Window port for front of chamber? Peter Photographs and diagrams of experimental setup -- organized clearly for beam operators during tuning: add technical drawing on elog. Alignment -- 2 end caps and one target ladder mount for optics reflector (8 mm diameter?) For survey people. Peter Adjustable feet to be produced for radial alignment: Peter / Toby Contact CERN about date for beam connection: As soon as possible after 20th October. Talk to Karl/Olof. Collimator at exit of SEC ? needs to be aligned. Ask what the other beamlines do - does olof have collimator ahead of his chamber Calibration of Target ladder positions. Peter / Daid Email to Karl & Olof about: - FC after SEC - Parcel of gain resistors - date for connection of SEC to our chamber - collimator in front of chamber ? - N2 bottle
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown